{"id":31255,"date":"2024-07-03T15:11:35","date_gmt":"2024-07-03T12:11:35","guid":{"rendered":"https:\/\/www.wolf-group.com\/?post_type=reference&p=29245"},"modified":"2024-10-17T18:44:16","modified_gmt":"2024-10-17T15:44:16","slug":"ovruch-kindergarten","status":"publish","type":"reference","link":"https:\/\/www.wolf-group.com\/lt\/reference\/ovruch-kindergarten\/","title":{"rendered":"Ovruch Kindergarten"},"content":{"rendered":"\n
This kindergarten, which has space for 160 children, was built in two stages. The first stage involved engineering, production and on-site assembly and took 170 days, while the second stage was completed in 150 days.<\/p>\n","protected":false},"excerpt":{"rendered":"This kindergarten, which has space for 160 children, was built in two stages. The first stage involved engineering, production and on-site assembly and took 170 days, while the second stage was completed in 150 days.","protected":false},"featured_media":31328,"menu_order":12,"template":"","meta":[],"reference_category":[158],"acf":[],"yoast_head":"\n